East Improvement District

East Improvement District Water Delivery System. This system consists of a 19,000-horsepower vertical turbine pump station, capable of pumping 106,400 gallons per minute,  placed in the Columbia River, with an air burst tee screening system extended out into deep water, four major delivery points to distribute water to the members, 3,607’ of 78” steel pipe, 15,933’ of 75” fiberglass reinforced polymer pipe, 15,877’ of 72” fiberglass reinforced polymer pipe, 10,640’ of 66” fiberglass reinforced polymer pipe, and numerous valves, fittings, and appurtenances.