Friends Dairy

This project was a parlor replacement of an existing facility.  The new facility was constructed adjacent to the exiting structure consisting of an office space, milk facility, 2 milk tanks, a 60-cow rotary, flush system modification, free stall barns, and preparations for a new waste management system.  The new parlor was designed as a new 60-cow rotary barn with the facility milking 5,000 cows and consists of over 18,000 sq. ft. facility. ICD provided the design and construction for a design build of the facility meeting the owner’s criteria in budget and timeline.

1/12

© 2021 by IRZ Construction.